The Academic Perspective Procedia publishes Academic Platform symposiums papers as three volumes in a year. DOI number is given to all of our papers.
Publisher : Academic Perspective
Journal DOI : 10.33793/acperpro
Journal eISSN : 2667-5862
[1] Egan J. (1998) Rethinking Construction: The report of the Construction Task Force to the Deputy Prime Minister, John Prescott. https://constructingexcellence.org.uk/wp-content/uploads/2014/10/rethinking_construction_report.pdf
[2] Agarwal R., Chandrasekaran S and Sridhar M. (2016) The digital future of construction: Global Infrastructure Initiative. McKinsey & Company
[3] Wessel L., Baiyere A., Ologeanu-Taddei R., Cha J., and Blegind-Jensen T. (2021) “Unpacking the Difference Between Digital Transformation and IT-Enabled Organizational Transformation. Journal of the Association for Information Systems (22:1), pp. 102-129.
[4] Dawood, N., Akinsola, A. and Hobbs, B. (2002) 'Development of automated communication of system for managing site information using internet technology', Automation in Construction 11(5) 557-572
[5] Anumba, C.J., Pan, J., Issa, R.R.A. and Mutis, I. (2008) 'Collaborative project information management in a semantic web environment. Engineering, Construction and Architectural Management 15(1) 1-17.
[6] Zafary, F. (2020) Implementation of business intelligence considering the role of information systems integration and enterprise resource planning. Journal of Intelligence Studies in Business, Vol. 10 (1), pp. 59-74.
[7] Abukhder, J. and Munns, A.K. (2005) 'Attributing Management Problems on Construction Projects to Project Information', 19th Annual ARCOM Conference, Association of Researchers in Construction Management, pp. 543-552
[8] Demian P. and Walters D. (2013) The advantages of information management through building information modelling. Construction Management and Economics, DOI:10.1080/01446193.2013.777754
[9] Zuppo C.M. (2012) Defining ICT in a boundary-less world: the development of a working hierarchy. International Journal of Managing Information Technology, Vol.4 (3)
[10] Adwan E.J. and Al-Soufi A. (2016) A Review of ICT Technology in Construction. International Journal of Managing Information Technology (IJMIT) Vol.8, No.3/4,
[11] Ying H and Lee S.H. (2016) Survey of the research of ICT Applications in the AEC Industry: a view from two mainstream journals. The 16th International Conference on Construction Applications of Virtual Reality (CONVR 2016), Hong Kong, 11-13 December 2016. In Conference Proceedings, 2016, p. 471-483
[12] Ibem E.O. and Laryea S. (2014) Survey of digital technologies in procurement of construction projects. Automation in Construction 46 (2014) 11–21
[13] Christensson, P. (2010). ICT Definition. Retrieved 2020, Oct 29, from https://techterms.com
[14] Tapscott D (1997) The Digital Economy: Promise and Peril in The Age of Networked Intelligence. McGraw-Hill; 1 edition
[15] BDF (2018)Digitale Wirtschaft und Gesellschaft: Industrie 4.0.
[16] Hermann M., Pentek T. and Otto B. (2015) Design Principles for Industrie 4.0 Scenarios: A Literature Review. Working Paper No. 01 / 2015, Business Engineering Institute St. Gallen, Lukasstr. 4, CH-9008 St. Gallen
[17] Martin (2017) Industry 4.0: Definition, Design Principles, Challenges, and the Future of Employment. https://www.cleverism.com/industry-4-0/
[18] GOS (2016) Distributed Ledger Technology: beyond block chain: A report by the UK Government Chief Scientific Adviser. https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/492972/gs-16-1-distributed-ledger-technology.pdf
[19] Conner B.P., Manogharan G.P., Martof A.N., Rodomsky L.M., Rodomsky C.M., Jordan D.C. and Limperos J.W. (2014) Making sense of 3-D printing: Creating a map of additive manufacturing products and services. Additive Manufacturing, Vol. 1-4, pp. 64-76.
[20] AABM (2016) ABM: Aerial additive building manufacturing. http://www.aerial-abm.com/
[21] Hisham S. (2018) Is construction industry ready for City Information Modeling? Geospatial Word. https://www.geospatialworld.net/blogs/is-construction-industry-ready-for-city-information-modeling/
[22] Thurgood J.D. and Bethel J.S. (2003). Geographic Information System. In: The Civil Engineering Handbook, Edited by W.F. Chen and J.Y. Richard Liew. CRC Press
[23] Furness, A. (2000), "Machine‐readable data carriers – a brief introduction to automatic identification and data capture", Assembly Automation, Vol. 20 No. 1, pp. 28-34.
[24] Andreasen M.M. (1987) Integrated Product Development, Springer Verlag, 1987
[25] Krause F.L., Kimura F. and Kjellberg T. (1993) Product Modelling, Annals of the CIRP vol. 42 (2).
[26] Hvam, L., Mortensen, N.H. and Riis. J. (2008). “Product customization.” Springer, Berlin and Heidelberg.
[27] Atzori L., Iera A. and Morabito G. (2017) Understanding the Internet of Things: definition, potentials, and societal role of a fast-evolving paradigm. Ad Hoc networks, Vol. 56, pp. 122-140.
https://www.bmbf.de/de/zukunftsprojekt-industrie-4-0-848.html
[28] Mandal S. (2013) Brief Introduction of Virtual Reality & its Challenges. International Journal of Scientific & Engineering Research, Volume 4, Issue 4, April-2013
[29] Bekele M.K. and Champion E. (2019) Redefining mixed reality: user-reality-virtuality and virtual heritage perspectives. Intelligent & Informed, Proceedings of the 24th International Conference of the Association for Computer-Aided Architectural Design Research in Asia (CAADRIA) 2019, Volume 2, 675-684. © 2019 and published by the Association for Computer-Aided Architectural Design Research in Asia (CAADRIA), Hong Kong
[30] Wastiels L. and Decuypere R. (2019) Identification and comparison of LCA-BIM integration strategies. In Proceedings of the IOP Conference Series Earth and Environmental Science, Graz, Austria, 11–14 September 2019; Volume 323.
[31] Chen K., Lu W., Peng Y., Rowlinson S., Huang G.Q.(2015) Bridging BIM and building: From a literature review to an integrated conceptual framework. International Journal of Project Management, Vol. 33(6), pp. 1405-1416,
[32] Olawumi T.O, Chan D.W.M, Wong J.K.W. and Chan A.P.C. (2018) Barriers to the integration of BIM and sustainability practices in construction projects: A Delphi survey of international experts, Journal of Building Engineering, Vol. 20, pp. 60-71,
[33] Hijazi, I.; Donaubauer, A.; Kolbe, T.H. BIM-GIS Integration as Dedicated and Independent Course for Geoinformatics Students: Merits, Challenges, and Ways Forward. ISPRS Int. J. Geo-Inf. 2018, 7, 319. https://doi.org/10.3390/ijgi7080319
[34] Liu Z., Deng Z. and Demian P. (2018) Integration of Building Information Modelling (BIM) and Sensor Technology: A Review of Current Developments and Future Outlooks. CSAE '18: Proceedings of the 2nd International Conference on Computer Science and Application Engineering, October 2018 Article No.: 144, pp.1–5. https://doi.org/10.1145/3207677.3277991
[35] Gan, V.J.L.; Liu, T.; Li, K. Integrated BIM and VR for Interactive Aerodynamic Design and Wind Comfort Analysis of Modular Buildings. Buildings 2022, 12, 333. https://doi.org/10.3390/buildings12030333
[36] Zhang J., Luo H. and Xu J.(2022) Towards fully BIM-enabled building automation and robotics: A perspective of lifecycle information flow. Computers in Industry, Vol. 135
[37] Sarkar, D., Pandya, K., Dave, B. et al. Development of an integrated BIM-ERP-IoT module for construction projects in Ahmedabad. Innovative Infrastructure Solutions, Vol.7 (50).
[38] Meschini S., Iturralde K., Linner T. and Bock T. (2016) Novel applications offered by Integration of Robotic Tools in BIM-based Design Workflow for Automation in Construction Processes. Proceedings of the CIB*IAARC W119 CIC 2016 Workshop, Munich, Germany
[39] Farr E.R.P., Piroozfar P.A.E. and Robinson D. (2014) BIM as a generic configurator for facilitation of customisation in the AEC industry. Automation in Construction, Vol. 45, pp.119-125.
[40] Memon A.H., Rahman S.A., Memon I. and Azman N.I.A. (2014)BIM in Malaysian Construction Industry: Status, Advantages, Barriers and Strategies to Enhance the Implementation Level. Research Journal of Applied Sciences, Engineering and Technology, Vol. 8(5), pp.606-614
[41] StK (2018) Utilization of BIM in different phases of construction. [Online] https://www.bimservicesindia.com/blog/utilization-of-bim-in-different-phases-of-construction/
[42] Shao, Z., Feng, Y., & Liu, L. (2012). The mediating effect of organizational culture and knowledge sharing on transformational leadership and Enterprise Resource Planning systems success: An empirical study in China. Computers in Human Behavior, Vol.
[43] Zhou, J., Bi, G., Liu, H., Fang, Y., & Hua, Z. (2018). Understanding employee competence, operational IS alignment, and organizational agility–An ambidexterity perspective Information & Management, Vol. 55, pp. 695–708